Builder Floor in Gurgaon? Check These 5 Approval Documents Before You Pay

After DTCP sealed seven buildings in Sector 72 this week, one lesson stands out: the paperwork protects you, not the sales pitch. A practical checklist.

Why this is in the news

A real estate consultant's news summary dated 28 October 2026 reports that DTCP sealed seven buildings in Gurugram's Sector 72 and demolished an illegal structure, as part of an intensified drive against unauthorised construction. I have only read that headline-level summary, so check the original news report for details. The reason it matters to buyers is simple: if a building is found to be unauthorised, the buyer is the one left holding the problem.

1. The sanctioned building plan

Ask for a copy and compare it with what you are being sold. Count the floors. Check that the parking, stilt area and any terrace or extra room you are shown actually appear in the plan. Anything not in the plan is a risk.

2. The licence or approval for the plot or colony

Ask for the licence or layout approval and confirm the plot sits inside an approved layout. If the seller cannot show it, treat that as a reason to stop.

3. Occupancy certificate status

For a completed floor, ask whether an occupancy certificate has been issued, and get a copy. DTCP has previously appealed to buyers to confirm that OC files have been submitted before they close a deal. Do not accept a verbal assurance.

4. Title and payment trail

Have your own lawyer check the title and the chain of ownership. Pay only through banking channels, and keep every receipt. A clean payment trail protects you if there is ever a dispute.

5. Your own site check

Visit the property and compare it with the plan. A stilt floor shown as parking should not be a room. Photograph what you see. This is general guidance and not legal advice, so speak to a property lawyer before you pay a token amount.